Skip to main content
AL-AHAD GROUP AL-AHAD GROUP Global Recruitment Solutions

AL-AHAD GROUP: Italy Employment Quotas 2026–2028

Italy’s 2026–2028 programme sets entry limits across different work categories. This AL-AHAD GROUP guide helps employers interpret annual totals and reservations before assessing an actual authorization request. Official sources were checked on 11 October 2026; the figures are programme limits and do not identify available jobs or company allocations.

Official sources last checked: 11 October 2026

Pakistani skilled worker checking a work folder near Florence

The three-year total and annual categories

YearNon-seasonal employedSelf-employedSeasonalAnnual total
202676,20065088,000164,850
202776,20065089,000165,850
202876,20065090,000166,850

The annual totals sum to 497,550. Articles 5–7 of the DPCM dated 2 October 2025 establish the programme and category limits. The three-year sum is not one pool an employer may use interchangeably across years or categories.

Programme total, reservation and employer case

A nationwide total describes the programme’s ceiling. A reservation specifies which origin, category or submission channel can use part of that ceiling. The employer’s actual case still requires the correct category and official assessment.

Do not add a reservation to the annual total as though it were extra capacity. Equally, a published total is not evidence of the balance remaining today, a company mandate or authorization for a specific worker.

How the non-seasonal employed total is divided

Circular category202620272028
Specified origin-country group25,00025,00025,000
Countries with agreements taking effect during the programme18,00026,00034,000
Qualifying stateless/refugee category300300300
Family assistance13,60014,00014,200
Unreserved entries in the circular table19,30010,9002,700
Total non-seasonal employed76,20076,20076,200

The 25,000 figure is shared by the named-country group. Pakistan’s inclusion does not make that entire number a Pakistan allocation. An unreserved table entry should also not be read as a universal exemption from category, employer or authorization requirements.

Read country eligibility with the current annual instruction

The decree and implementing circular contain the named origin-country group and a separate category for agreements taking effect during the three years. The 1 October 2026 circular additionally includes Kenya from 2027, referring to the agreement signed on 2 July 2026.

For an employer’s case, identify the applicable country/category evidence instead of relying on a general nationality list. Do not rewrite the original 2025 text as though every later addition was already present, or assume a new addition changes all reserved-category arithmetic.

Seasonal reservations sit within seasonal totals

Seasonal circular category202620272028
New cooperation-agreement country category12,60012,75013,000
Qualifying multi-year seasonal requests5,0006,0007,000
Priority agriculture organization submissions47,00047,00047,000
Priority tourism organization submissions13,00014,00015,000
Unreserved entries in the circular table10,4009,2508,000
Total seasonal88,00089,00090,000

The multi-year reservation has a previous-seasonal-entry condition and an employer request. Priority organization submissions also have specified requirements. These are not unconditional worker entitlements or additional totals.

Use the corrected tourism organization instruction

The 30 October 2025 correction adds Confartigianato Imprese to the qualifying representative national tourism-employer organization list omitted from the original circular table.

An employer using an organization-submission category must assess the actual organization’s eligibility and authority. Do not copy the original incomplete list or confuse an Italian employer-organization channel with a Pakistani agency’s claim to have jobs.

Self-employment is a separate allocation

Each year’s 650 self-employed entries belong to separate reserved and unreserved categories. Article 6 describes categories such as qualifying entrepreneurs, professionals, specified corporate-office holders, artists and innovative start-ups.

The existence of this allocation does not make an ordinary employed-work request a self-employed request or establish eligibility for every freelance activity. Use the specific authorization and visa category; this guide does not provide a complete self-employment application procedure.

Family assistance is included, not added again

The 13,600/14,000/14,200 family-assistance figures are included in the 76,200 non-seasonal employed annual total. For 2027, the annual circular distinguishes the in-quota A-bis model from B2020 employed-work applications.

Do not describe family assistance as a spare opening for every occupation or merge it with another care-related category without the actual legal conditions. Employer type and the work proposed matter.

Annual totals do not establish current operational dates

The DPCM sets three-year totals, while the 1 October 2026 circular supplies current 2027 preparation and submission instructions. Any stated 2027 clock time must use Italy local time, Europe/Rome.

This guide has not verified a 2028 annual operating circular, current models or submission timetable. It does not describe the 2028 allocation as open now. Use the current annual circular and ALI notice before planning an employer submission.

A useful employer planning sequence

Identify the genuine employer, proposed activity, work category, origin-country/category evidence and any relevant reservation. Then use the applicable annual model and verify the actual authorization stage. This planning sequence helps interpret the case; it does not establish remaining quota or approval.

AL-AHAD GROUP has no active Italy vacancies or recruitment requirements, accepts no Italy applications or CVs and charges no Italy recruitment fee. This guide offers information only.

Keep the official chronology clear

The decree is dated 2 October 2025, Gazette publication 15 October 2025, implementing circular 16 October 2025, correction 30 October 2025, and 2027 circular 1 October 2026.

Read later compatible instructions alongside the original programme. Source dates and this guide’s review date are separate from a company’s recruitment authorization, a worker’s permit or the page’s actual publication.

2026 openings are historical dates, not remaining places

The 2026 submission openings were 12 January for seasonal agriculture, 9 February for seasonal tourism, 16 February for B2020 non-seasonal employment and 18 February for domestic family assistance. Each began at 09:00, Italy local time. The circular permits 2026 submissions until 31 December 2026 subject to quota availability; it does not establish a current unused balance. A 2026 opening must not be relabelled as a future 2027 date. Use the separately announced 2027 preparation and submission calendar for that annual cycle.

Related checks: 2027 employer calendar · Employer ALI application · Italy information overview

Frequently asked questions

What is the total programmed for 2026–2028?

497,550 entries: 164,850 in 2026, 165,850 in 2027 and 166,850 in 2028. These are programme limits, not vacancies.

Are 76,200 and 650 the same employed-work category?

No. Each annual programme has 76,200 non-seasonal employed entries and a separate 650 self-employed allocation.

Is the specified-country group’s 25,000 quota Pakistan-only?

No. It is shared by the listed origin countries, including Pakistan. Do not treat the whole group number as a single-country allocation.

Are family-assistance entries additional to the non-seasonal total?

No. They sit within 76,200: 13,600 in 2026, 14,000 in 2027 and 14,200 in 2028.

Do the seasonal priority reservations add extra capacity?

No. The reservations form part of the 88,000/89,000/90,000 annual seasonal totals and carry their own category conditions.

Can every seasonal worker claim a multi-year reservation?

The decree requires a qualifying previous seasonal entry within five years and the employer’s multi-year request. It is not an unconditional entitlement.

Why does the tourism organization correction matter?

It corrects the original circular’s omission of Confartigianato Imprese. Organization eligibility should be assessed against the corrected instructions.

Does a programmed quota show how many entries remain today?

No. A ceiling or reservation does not establish the current balance or approval of a particular employer request.

Has this guide verified 2028 submission dates?

No. It verifies the programme totals but not a 2028 annual operating circular or current timetable.

Can I apply to AL-AHAD GROUP for one of these entries?

AL-AHAD GROUP has no active Italy vacancies or recruitment requirements and accepts no Italy applications or CVs. Quota totals are not company job invitations.

Official references

  1. DPCM 2 ottobre 2025 — articolo 5, ingressi complessivi nell'ambito delle quote — 2025-10-15; checked 2026-10-11.
  2. DPCM 2 ottobre 2025 — articolo 6, lavoro subordinato non stagionale e lavoro autonomo — 2025-10-15; checked 2026-10-11.
  3. DPCM 2 ottobre 2025 — articolo 7, lavoro subordinato stagionale — 2025-10-15; checked 2026-10-11.
  4. Circolare interministeriale n. 8047 del 16 ottobre 2025 — D.P.C.M. 2 ottobre 2025, flussi 2026-2028 — 2025-10-16; checked 2026-10-11.
  5. Circolare congiunta n. 7185 del 1 ottobre 2026 — Annualità 2027: quote di ingresso, fase di precompilazione delle domande e termini di presentazione — 2026-10-01; checked 2026-10-11.
  6. Errata corrige - Circolare interministeriale sul Decreto flussi 2026-2028 — 2025-10-30; checked 2026-10-11.
  7. Entry into Italy — Publication date not stated; checked 2026-10-11.
  8. PRECOMPILAZIONE DOMANDE DECRETO FLUSSI 2027 — Portale Servizi ALI — 2026-10-09; checked 2026-10-11.
  9. DECRETO DEL PRESIDENTE DEL CONSIGLIO DEI MINISTRI 2 ottobre 2025 — Programmazione dei flussi di ingresso legale in Italia dei lavoratori stranieri per il triennio 2026-2028. (25A05656) — 2025-10-15; checked 2026-10-11.

Related AL-AHAD GROUP procedural guides